Inspection Report of the Power Distribution Cabinet – Factory 2

  • The equipment and electrical cabinets have been installed correctly, meeting technical requirements and operational safety.

  • The wiring is neat, tidy, and ensures insulation standards.

  • The busbars are correctly installed, with appropriate colours and sizes.

  • The protective earthing system has been installed and connected properly.

  • The insulation resistance has been tested and meets standards.

  • Labels, warning signs, and operating instructions have been properly affixed.

  • The electrical cabinet is free of defects, clean, and safe to operate.

  • The system operates stably during the test run.

Conclusion: The power distribution cabinet at Factory 2 meets technical and safety standards and is eligible for operation.